The construction project requires the application of advanced technology and standards in design, in detailing/ shop drawings as well as high precision in fabrication and erection to bring great success to the whole project. As the result, all the pre-engineered steel buildings come on-line in 2015 with the highest building of 60m and a total weight of 7,000MT.
*** This article is intended to provide general information about the pre-engineered steel building and steel structure industry only. For further details or clarification based on your needs, please contact Pebsteel directly.