One-stop provider from design and fabrication to installation for Pre-engineered Buildings and Structural Steel
1994
established
50+
countries we served
12
regional sales offices
100+
in-house engineers
Japanese Shareholders
OKAYA & CO., LTD.
NIPPON STEEL
Founded in Europe alongside Japanese shareholders, Pebsteel operates in 12 regional sales offices and has its main headquarters in Vietnam.
Our team is 1,400+ strong, made up of certified engineers and dedicated business personnel with a deep understanding of our customers’ needs.
What we do
We at Pebsteel are committed to providing our customers with world-class service through all stages of the process. From design to fabrication, erection, and post-sales assistance, we are there for you every step of the way.
Our vision
We aim to become the benchmark in the steel building industry, through innovative, safe, and sustainable solutions.
Our mission
Empowering people and businesses through better engineered spaces.
Our values
Effective solutions
- Continuous innovative design of new systems, technology, services and processes tailored to the customer’s needs.
- Optimization and updating of current solutions to ensure maximum efficiency and benefits for all customers.
Dynamic teamwork
- Our highly specialized team provides the customer with a personalized experience.
- A well-oiled machine, our experienced workforce eliminates customer stress.
Committed partnerships
- We maintain customer support through every stage of the process. Our support does not expire. We maintain permanent loyalty to our customers.
- At Pebsteel, integrity is of paramount importance. We are transparent and honest, and dedicated to the success of all customers, shareholders, and stakeholders.
Our people
Undeterred by global challenges, Pebsteel has continued to expand across Southeast Asia and beyond, thanks to the leadership of Sami Kteily and Adib Kouteili.
Strong proponents of diversity and equality, we are proud to work with partners and staff from all walks of life.
Founders
SAMI Kteily
Executive Chairman
ADIB Kouteili
Co-Founder & Director
Executive Committee members & Country Heads
The team
Standing by to serve
Factory 1
The first Pebsteel factory is designed in the “I” shape to maximize unobstructed internal production flow. It is equipped with fully automated submerged arc welding lines from Lincoln (USA).
Factory 2
The building displays excellence and innovation in every piece of engineering. It is 17 meters high with a 4:10 slope and is supported by Pebsteel’s castellated beams and open-web-joists system.
The roof is fitted with our special LokSeam® profile – the optimal choice to prevent water leak.
Factory 3
This factory is equipped to produce both pre-engineered building structures and heavy structures, including hot-rolled members for power plants, oil & gas facilities, multi-storey/high-rise buildings, and other special steel structures.
Factory 4
The 4th factory is specialized in a unique design with a wide bay spacing of up to 15 meters without jack beam support.
Pebsteel uses huge size Z300 purlins which are made of Silver180® coated steel (AZ180 Gr/M2). This material is ideal for intensive corrosion resistance.
Factory 5
The first factory to use our special rigid frame PebHybrid®, which can shorten fabricating time and extend the construction life cycle.
The special insulation material PebInsul™ and great ridge ventilation system help to make the interior space cooler and more comfortable. PebWall® and PebLiner™ were chosen for the cladding to enhance the aesthetic of the entire factory.
Factory 6
The 6th plant is more invested in advanced machine systems to produce heavy steel structures for complex structures. Pebsteel applies the latest technical innovation in the pre-engineered buildings industry to the ridge ventilation system, as well as using high-performance PebFoam™ in thermal insulation and PebHybrid® for rigid frames and mezzanine joists.
Factory 7
Located in the Thilawa Special Economic Zone, Pebsteel’s factory in Myanmar commits a total fabricating capacity of up to 30,000 MT per year. This large 30,000-square-meter factory and state-of-the-art machinery systems can handle heavy steel structures to quickly meet the toughest demands set by complex structures. The new facility is built with the latest products and technologies from Pebsteel: PebHybrid® for rigid frames and mezzanine joists; modern insulation and ridge ventilation systems; and environmentally friendly paint.