fbpx

Latest news

PEB - maximum flexibility in factory expansion

Structural Steel - 04/09/2026

Fire Rating for Pre-Engineered Steel Buildings: When You Need It & How to Specify It (2026)

Most single-story pre-engineered warehouses and factories don’t require fire-rated structural steel at all — many low-hazard, single-story occupancies fall under building code categories that permit unprotected structural steel, provided height and floor area stay within specified limits. But if your project includes an occupied mezzanine floor, stores hazardous or...

Custom-designed pre manufactured steel hangar with large clear-span steel structure

Pre Engineered Steel Building - 03/09/2026

Aircraft Hangar Steel Structure: Clear-Span Design, Door Systems & Fire Classification Guide (2026)

An aircraft hangar has one non-negotiable structural requirement that almost no other industrial building shares: the interior must be completely column-free across the full width the aircraft needs to move, park, and be serviced. That single requirement — clear span, at scale — is what makes steel the default...

Company News - 05/08/2026

PEBSTEEL AND HO CHI MINH CITY UNIVERSITY OF ARCHITECTURE SIGN STRATEGIC PARTNERSHIP TO DEVELOP FUTURE CONSTRUCTION TALENT

Ho Chi Minh City, Vietnam – August 4, 2026 – As the construction industry continues to evolve amid rapid technological advancement, innovation, and the growing demand for sustainable development, stronger collaboration between industry and academia has become increasingly important in preparing the next generation of highly skilled professionals. With...

PebFoam | Eco-efficient insulation solution for industrial building

Pre Engineered Steel Building - 30/07/2026

Roof & Wall Insulation Systems for Pre-Engineered Steel Buildings: Complete Selection Guide (2026)

The insulation system you choose doesn’t just affect indoor comfort — it changes your building’s cooling load, its fire rating, and whether condensation forms inside your roof assembly and drips onto stored inventory or production equipment below. There are two fundamentally different ways to insulate a pre-engineered steel building...

PEB Steel’s project is on the installation stage in Tokyo, Japan

Project News - 14/04/2015

PEB Steel’s First Logistics Center Project In The Heart Of Tokyo
“PEB Steel quality of fabrication is similar to the quality of fabrication in Japan” is a compliment of Mr. Kubo, the Project Manager of Nippon Steel & Sumikin Engineering...
A photo of PEB Steel Vietnam’s engineers at the new factory

Project News - 10/11/2014

Pebsteel Celebrates 5th Steel Building Factory and 20th Anniversary
On the 11th November (11/11), PEB Steel Buildings will celebrate the inauguration of PEB Steel 5th Factory and 20th Birthday Anniversary for its operation in Vietnam. On this occasion,...
The Board of Directors of PEB Steel Buildings together with partners, leaders of the province, and Dong Xuyen Industrial Park take a photo together at the 5th steel factory groundbreaking ceremony.

Project News - 10/04/2014

Groundbreaking Ceremony Of The 5th PEB Steel Factory
On April 4th, 2014, PEB Steel Buildings Co., Ltd. formally held the ground-breaking ceremony of the 5th plant in Dong Xuyen Industrial Zone, Ba Ria Vung Tau province. The...
logo-switcher

Local websites

Head Office - Export Sales

Sales Office - Cambodia

Sales Office - Thailand

Sales Office - Philippines

Sales Office - Indonesia

Sales Office - Chinese

Sales Office - Japanese

Global website

Learn all about Pebsteel, our worldwide solutions and projects.

Global website
logo

Global website

Learn all about Pebsteel, our worldwide solutions and projects.

Global website