
PEB Steel Myanmar Holds Grand Opening Celebration At Pullman Hotel
Yangon – PEB Steel Myanmar officially held the grand opening ceremony for its first factory in Myanmar on March 29, 2019, at Pullman Hotel. The ceremony was solemnly held in the presence of representatives of local authorities, investors, constructors, consultants, and executive members of PEB Steel Myanmar.
Located in the Thilawa Special Economic Zone (TSEZ), the 30,000-m2 factory with a total investment of $25 million will be equipped with the latest advanced technologies and designs to reach a monthly capacity of 3,000MT for steel structures.
The plant will be headed by an excellent team of engineers and supervisors, with more than 335 qualified workers, to ensure the production of top-quality products, and contribute to the quality of construction in Myanmar.

Board of Directors posted with delegates

Mr. Sami Kteily addressed an opening speech

The moment of Yangon factory was officially launched

Mr. Sami Kteily, executive chairman of PEB Steel Buildings spoke to TSEZ representative

Mr. Adib Kouteili, managing director of PEB Steel Buildings gave a name card to the guest

Mr. Nanda Kumar, general manager (operations) of PEB Steel Myanmar welcomed the guest

A traditional performance during the grand opening night