Pre-engineered buildings are a superior solution for businesses when building factories, warebuildings, factories, or other structures. In the construction industry, having an accurate and up-to-date quote is important to help you shape a project plan and budget. Pebsteel invites you to learn about the latest pre-engineered steel building quotes so that you can search for and choose a reputable unit in the field through the following article.
1. What is a pre-engineered steel building? Structure of pre-engineered steel building
Pre-engineered steel buildings are buildings built from prefabricated steel frame parts at the factory according to specific designs and dimensions. The steel frame parts are then transported to the site and assembled together by use of bolts, screws or welding.
A pre-engineered steel building structure includes:
- Steel frame: The main bearing part of the building, including columns, beams, braces, and connecting accessories.
- Partition: The part that creates the space inside the building, including insulation panels or other materials.
- Roof: The top covering of a building, consisting of insulating panels or other materials.
- Floor: The foundation of the building, including insulation panels or other materials.
See more: Factors Affecting Costs Of Steel-Structure Factory Construction
2. Outstanding advantages of pre-engineered steel buildings
Pre-engineered steel buildings have many advantages compared to traditional buildings, such as:
- Time-saving: By using pre-manufactured steel frame parts, pre-engineered steel building construction takes only about 2 to 4 weeks, while traditional building construction can take 3 to 6 months.
- Cost savings: By using less labor, less materials and less overhead, the construction cost of pre-engineered steel buildings is only 50% to 70% of that of traditional building constructions.
- Quality assurance: Thanks to the use of steel frame parts manufactured according to international standards and thoroughly tested before shipment, pre-engineered steel buildings are highly durable, rust-proof, fire-proof, moisture-proof, crack-resistant and resistant to weather and environmental influences.
- Design flexibility: Pre-engineered steel buildings can be designed in a variety of shapes, sizes and colors to meet the needs and preferences of the business by using a steel frame as the main structure.
- Environmentally friendly: By using reusable or recyclable steel frame parts, pre-engineered steel buildings reduce the amount of waste and emissions that pollute the environment.
See more: Prefabricated Factory Structure
3. Latest price quotes for pre-engineered steel building 2023
The quotation for pre-engineered steel buildings depends on many different factors, including:
- Area and height of the building
- Type and quantity of the steel frame parts
- Type and quantity of the coating material
- Terrain and construction site
- Construction time
According to statistics of the Vietnam Steel Association, the domestic construction steel price has increased by 15% to 20% compared to 2022 due to the impact of the Covid-19 pandemic and climate change. Therefore, the quotation of pre-engineered steel buildings in the market has also seen corresponding adjustment.
4. Design and construction process of pre-engineered steel buildings
The design and construction process of pre-engineered steel buildings usually includes the following steps:
- Step 1: Survey customer needs
During this phase, we study and evaluate the client’s requirements, desires, and goals for the project. This survey helps to define the project scope, propose the right solution and create the correct interaction between the customer and the contractor, ensuring the success of the pre-engineered steel building project.
- Step 2: Design technical drawings
Develop detailed drawings, including specifications and 3D simulations to design the structure and layout of pre-engineered steel building components. This design ensures compliance with regulations and technical standards and helps evaluate the feasibility and structure of the project. Technical drawings are an important basis for further construction steps.
- Step 3: Producing steel frame parts
Columns, beams, purlins and other parts will be processed and manufactured according to technical drawings at factories and workshops. Steel frame parts will be checked for quality and carefully packed before being shipped to the construction site.
- Step 4: Installation and finishing
We Install components such as columns, beams, and purlins according to technical drawings, and then complete finishing touches such as painting and rust protection to create a complete, high-quality final result. This process ensures that the pre-engineered steel building meets structural and aesthetic requirements and is ready for use.
5. Factors to consider when choosing a pre-engineered steel company company
When choosing a pre-engineered steel building construction company, you should consider the following factors:
- Prestige and experience: You should choose a reputable and experienced company in the field of pre-engineered steel building construction that has had many successful projects and received satisfactory reviews.
- Quality and cost: Enterprises should choose a company with high-quality products and services that ensure safety, sustainability, and aesthetics for pre-engineered steel buildings. You should always compare the costs of different companies to find the right price that fits your budget.
- After-sales service: Enterprises should choose a company with good after-sales service that will support businesses in the process of using and maintaining pre-engineered steel buildings. You should also check the company’s warranty and insurance terms to ensure their rights.
6. Why should you choose Pebsteel for your pre-engineered steel building?
Pebsteel is a reputable pre-engineered steel building construction unit with many years of experience in the field. The company has an elite team of engineers and skilled workers with many years of experience, and are highly knowledgeable of modern technologies to construct pre-engineered steel buildings of the highest quality.
Here are some reasons why businesses should choose Pebsteel for their projects:
- High quality: Pre-engineered steel buildings constructed by Pebsteel are of the highest quality, ensuring international standards of safety and sustainability. The company uses high-quality steel materials manufactured by reputable suppliers.
- Quick construction: Pebsteel Pre-engineered steel buildings are built very quickly and can be completed in just a few weeks. This is due to the structural steel buildings being manufactured in the factory, then simply transported and assembled at the site.
- Warranty service: Pebsteel provides warranty service for its pre-engineered steel buildings. This helps customers feel at ease about their investment and secure about the quality of work. We offer constant support if there are any problems during use.
If customers are in need of building pre-engineered steel buildings, please contact Pebsteel for advice on choosing the most suitable construction solution for their business needs and budget.
7. Conclusion
The above is a summary of the latest pre-engineered steel building quotes in 2023. Pre-engineered buildings are modern, time-saving, cost-effective and environmentally friendly construction solutions. If customers are in need of building pre-engineered steel buildings, please contact Pebsteel via email [email protected] or phone number +84 908 883531 for advice today.