Manufacturing Facilities

MANUFACTURING FACILITIES

PEB Steel factories in Vietnam are the very modern factories loaded with state-of-the-art machinery & equipment that produce first class products. The first two factories (building 1&2) were built over an area of 43,000 m2 (located in Dong Xuyen industrial park, Vung Tau province, Vietnam) which has designed with capacity of more than 60,000MT of completed pre-engineered building per annum.

This ultra high capacity enables PEB Steel to deliver its building in a very short period (which is very important in the construction industry) and also benefit from “economies of large scale” which transfers huge competitive prices to our customers.

This unique building is designed with "I" shape aimed to maximize un-obstructed flow of materials with 8 loading or unloading bays and boast 2 fully automated submerged arc welding lines from "Lincoln" - USA.

This building shows an excellence and innovation in every piece of engineering.
This factory has 17 meters height with a slope of 4:10 and is built up by coming PEB's castellated beams and open-web-joists. The roof is profiled using LokSeam which is a leak-proof system recently introduced by PEB Steel.

The building is equipping 8 roll formers of different shapes and sizes to suit wide range of appications and boasts, among its many specialized machinery, an 8.5 meters folder/ slitter from Australia.

 
 
 
 
This factory is equipped to produce mixed PEB structures as well as heavy structures including hot rolled structure for power plant, industrial plant, oil & gas facilities, multi-storey and high rise building and so forth.
 
 
 
 
The fourth factory in Vietnam will boost PEB Steel production capacity in Vietnam and bring the total capacity of PEB in the region to more than 120,000MT per year. This factory is UNIQUE in its design with a very special 15m bay spacing (without Jack Beams). PEB Steel used huge size Z300 purlins which has it origin from Silver180 Coated Steel (AZ180 Gr/M2) and Silver180 is very suitable for Extreme Corrosion Resistance.
First application of advanced galvanized main frame (PEBHybrid) which will shorten the fabrication period, and contribute to much longer life cycle of the project. In addition, using The special insulation material (PEBInsul) combined with improved Ridge Ventilation System (RV3.0), results in reduced heat retention of around 6oC, thus achieving cooler working environment. Besides, the Beauty of the Entire Building is guaranteed even further with the use of Liner panel for roof and wall (PEBLiner).
 
 
 
This new latest factory by PEB Steel covers an area of 12.000 m2. PEB is investing more in machinery with advanced technology to produce heavy steel structures aiming to meet the demand of complex structures projects. PEB Steel applied the technical Innovation in the PEB industry such as improved Ridge Ventilator system, PebFoam with high performance thermal insulation, and PebHybrid for Rafter and Mezzanine Joists.
 
 
 
PEB Steel Lloyd factory located in Pithampur, Madhya Pradesh State, India. The factory covers an area of 91,000 m2. Being built with modern facilities and state-of-the-art machinery & equipment, the factory will offer first class main frames, columns, beams, purlins, sheeting & components. Impressively, this pre-engineered buildings facilities can produce 5,000MT per month.
 
 
 
 
 
 
 
  This unique building is designed with “I” shape aimed to maximize un-obstructed flow of materials with 8 loading or unloading bays and boast 2 fully automated submerged arc welding lines from “Lincoln” – USA.factory-1factory1-6factory1-5factory1-4factory1-3factory1-2factory1-1factory1-8factory1-7

This building shows an excellence and innovation in every piece of engineering.

This factory has 17 meters height with a slope of 4:10 and is built up by coming PEB’s castellated beams and open-web-joists. The roof is profiled using LokSeam which is a leak-proof system recently introduced by PEB Steel.

The building is equipping 8 roll formers of different shapes and sizes to suit wide range of appications and boasts, among its many specialized machinery, an 8.5 meters folder/ slitter from Australia.

factory-2factory2-5factory2-4factory2-3factory2-2factory2-1
This factory is equipped to produce mixed PEB structures as well as heavy structures including hot rolled structure for power plant, industrial plant, oil & gas facilities, multi-storey and high rise building and so forth.factory-3factory3-2factory3-1
The fourth factory in Vietnam will boost PEB Steel production capacity in Vietnam and bring the total capacity of PEB in the region to more than 120,000MT per year. This factory is UNIQUE in its design with a very special 15m bay spacing (without Jack Beams). PEB Steel used huge size Z300 purlin which has it origin from Silver180 Coated Steel (AZ180 Gr/M2) and Silver180 is very suitable for Extreme Corrosion Resistance.factory-4factory4-1factory4-2factory4-3factory4-4factory4-5factory4-6factory4-7factory4-8
First application of advanced galvanized main frame (PEBHybrid) which will shorten the fabrication period, and contribute to much longer life cycle of the project. In addition, using The special insulation material (PEBInsul) combined with improved Ridge Ventilation System (RV3.0), results in reduced heat retention of around 6oC, thus achieving cooler working environment. Besides, the Beauty of the Entire Building is guaranteed even further with the use of Liner panel for roof and wall (PEBLiner).factory-5factory5-1factory5-2factory5-3factory5-4
This new latest factory by PEB Steel covers an area of 12.000 m2. PEB is investing more in machinery with advanced technology to produce heavy steel structures aiming to meet the demand of complex structures projects. PEB Steel applied the technical Innovation in the PEB industry such as improved Ridge Ventilator system, PebFoam with high performance thermal insulation, and PebHybrid for Rafter and Mezzanine Joists.

PEB Steel Lloyd Factory
PEB Steel Lloyd factory located in Pithampur, Madhya Pradesh State, India. The factory covers an area of 91,000 m2. Being built with modern facilities and state-of-the-art machinery & equipment, the factory will offer first class main frames, columns, beams, purlins, sheeting & components. Impressively, this pre-engineered buildings facilities can produce 5,000MT per month.
factory-7factory-india4factory-india3factory-india2factory-india1